
Location: Gold Coast
Objective: Retrofit HVAC System for multiple floor office fit out.
Outcome:
- De-commission and make safe existing supply and return air grilles to allow ceiling alterations to be carried out.
- De-commission and make safe existing temperature thermostats.
- Installed supply and return air grilles to suit the new layout.
- Supply and install new outside air fan.
- Provided Form 12 certification.
- Carried out commissioning and balancing.