
Location: Queensland
Objective: Air Boar were engaged by a builder to conduct a gap analysis of existing HVAC and fire system interfaces, verify results against the current compliance matrix, and provide a comprehensive report with recommendations and repairs.
Outcome:
- A thorough gap analysis identified minor discrepancies in system performance against the compliance matrix, which were promptly addressed.
- Post-repair verification testing confirmed all systems exceeded performance expectations, ensuring robust integration and safety.
- A detailed report was provided to the client, outlining the analysis, testing results, and completed repairs for transparency and record-keeping.
- The project concluded with positive outcomes, with the client commending the proactive approach to identifying and resolving potential issues.
Each project demonstrated the successful collaboration between the HVAC and fire systems teams, ensuring safety, compliance, and operational excellence.