End of DLP Testing (Queensland Health Project)

Location: Queensland

Objective: To complete interface testing as part of the end-of-Defects Liability Period (DLP) requirements, ensuring all HVAC and fire systems meet the client’s specifications.

Outcome:

  • Comprehensive testing was conducted to verify the system operated as per the Fire and Mechanical Matrix, including smoke extraction, fire damper operation, and alarm integration.
  • On completion of our initial testing, a gap analysis was provided to the customer identifying all areas not adhering to the matrix.
  • The identified issues during the initial commissioning phase were resolved by the installation company, ensuring compliance with the original design and performance criteria.
  • The final DLP testing report confirmed all systems were operational and compliant with regulatory standards.
  • Positive client feedback highlighted confidence in system reliability for future operations and saved the customer over $500,000.00 in future defects, that were solved during DLP.

Feel free to contact us for any HVAC related services.

Contact Us