Location: Redbank
Objective: HVAC system install for a large commercial space.
Outcome:
- Replaced outdated VRF systems with high-efficiency rooftop units and automated controls.
- Replaced all Filters within Air Grilles.
- Connected system via BACnet interface.
- Installed Truflow spray booth
- Installed Seismic restraints for all equipment, pipework, ductwork, and piping.
- Achieved a 20% decrease in annual HVAC operating costs.
- Ensured consistent temperature control throughout the space, which was essential to ensure the sensitive equipment was not affected during manufacturing.
- Provided Form 12 and 15.